Question Description
Reflect on the after readings Chapter 10: Budgeting Projects. Identify what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding.
Also, provide a graduate-level response to each of the following questions:
-
- You are the project manager in charge of construction of a new school building. Give one possible example each of a known known, known unknown, and unknown unknown you might encounter.
- Give an example of how a project manager could run into problems with cash flow, even when he is within budget on the overall project.
Note:
- Provide a min. of 500 words of reply.
- Must utilize the required textbook when completing the post.
- Must list all references and cite your source(s) within the body of the initial post.
- Every sentence with material from an outside source must be cited. Just putting a citation at the end of a paragraph or the entire post is not accurate.
- Citations must contain the page number on which you located the information. For our textbook material from page 15 would appear as (Kloppenborg et al. 2019, p 15)
- Initial post must utilize a narrative form. Use paragraphs. Do not use bullet points or provide lists.
"Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you "A" results."