Create Preventative Controls for SunGrafix,a video game design company. In some cases, the outage impactsidentified in the BIA may be mitigated or eliminated through preventivemeasures that deter, detect, and/or reduce impacts to the system. Wherefeasible and cost effective, preventive methods are preferable toactions that may be necessary to recover the system after a disruption.Preventative controls include the identification of effectivecontingency planning preventive controls and maintaining these controlson an ongoing basis. Identify and incorporate a variety of preventivecontrols into your BCP. Some of the listed controls are the following:
- Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls);
- Gasoline- or diesel-powered generators to provide long-term backup power;
- Air-conditioning systems with adequate excess capacity to prevent failure of certain components, such as a compressor;
- Fire suppression systems;
- Fire and smoke detectors;
- Water sensors in the computer room ceiling and floor;
- Heat-resistant and waterproof containers for backup media and vital non electronic records;
- Emergency master system shutdown switch;
- Offsite storage of backup media, non-electronic records, and system documentation;
- Technical security controls, such as cryptographic key management; and
- Frequent scheduled backups including where the backups are stored (onsite or offsite) and how often they are recirculated and moved to storage.
"Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you "A" results."