Question Description

Reflect on the after readings Chapter 7: Scope Planning. Identify what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding.

Also, provide a graduate-level response to each of the following questions:

  1. The sponsor for a project you have been managing sends you an email that he would like to make a small change to the project. What is your response and why?
  2. A potential client wants you to be project manager for the construction of a new house, but she is vague about the details. List a few questions you could ask her to gain a better understanding of the scope of the project.

Note:

  1. Provide a min. of 500 words of reply.
  2. Must utilize the required textbook when completing the post.
  3. Must list all references and cite your source(s) within the body of the initial post.
  4. Every sentence with material from an outside source must be cited. Just putting a citation at the end of a paragraph or the entire post is not accurate.
  5. Citations must contain the page number on which you located the information. For our textbook material from page 15 would appear as (Kloppenborg et al. 2019, p 15)
  6. Initial post must utilize a narrative form. Use paragraphs. Do not use bullet points or provide lists.

"Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you "A" results."

Order Solution Now